Hi @Isaina! Thank you for these proposals. I see you rephrase what you also wrote in #113 and #111. Can you explain the "Each cost-related entity should include: Unique BoQ code". Do you mean as a first-class cost item with own ID, with a relation between for example "3rd storey concrete" and individual wall and column objects, that might be composites with other material than just concrete?
I disagree that IFC (4.3) is a geometry-centric exchange format. It can be seen like that, looking at some of the implementations and practical usage, but it is not limited to that. For now, I moved it from the Issues to the Wishlist. Let's see if there is a bigger demand for such a solution. |
|
Hi @atomczak, Thank you for the clarification and for moving this to the Wishlist — that makes sense. Let me clarify what I mean by “Unique BoQ code”. I do not intend to introduce a competing cost engine or replace existing cost structures already available in IFC (IfcCostItem, IfcCostSchedule, etc.). My intention is much simpler and more interoperability-oriented. Across many EU workflows, the contractual Bill of Quantities is still maintained in Excel (or similar spreadsheet formats). Each row in such a BoQ has a unique item code that acts as the contractual reference. What I am proposing is: • Each cost-related entity (or cost grouping) should have a persistent and unique identifier that can be consistently linked to external BoQ rows. So in your example: “3rd storey concrete” would not necessarily mean every wall has its own cost ID. Instead: • A first-class cost item (or grouping entity) would carry a unique BoQ code. The key point is persistent cross-environment linking: IFC model ↔ BoQ spreadsheet This would allow: • Reliable quantity aggregation I am not aiming to compete with large authoring platforms (Revit, Allplan, Archicad). On the contrary — the idea is that those platforms export IFC, and then lightweight, web-based or local tools could consume IFC in a standardized way and build project-specific cost logic on top. The goal is interoperability and accessibility for smaller development teams, not replacing advanced cost modules of major vendors. Regarding the “geometry-centric” statement — I agree that IFC is not limited to geometry. My point was more about practical usage patterns in many implementations rather than the schema itself. I hope this clarifies the intention. |
|
Hi @atomczak, Let me explain the idea in a more practical and simplified way. In many EU construction workflows, the Bill of Quantities (BoQ) works like this: For example: If we have reinforced concrete of the same class and quality (e.g., C30/37), then all concrete of that type across the model belongs to the same BoQ code. That means: • All walls and columns using that same concrete quality Now another example: If a wall is made of concrete blocks instead of cast concrete: • Each block type has its own BoQ code So the important point is not that every IFC object gets its own cost ID. The important point is: Objects with the same execution logic and measurement rule share the same BoQ code. From a model perspective, this means: This allows: IFC model → automatic quantity aggregation → Excel BoQ consistency The key requirement is that the BoQ code is unique and persistent at project level, so that external tools (including simple web-based tools) can reliably connect model elements to contractual cost rows. This does not aim to replace existing cost structures in IFC, but to ensure stable linking between the model and real-world procurement documents. I hope this clarifies the concept in practical construction terms. |
|
Hi, I would like to clarify the proposal more concretely. We propose introducing a new standardized identifier (working title): IFCUniqueBoQ This would be a persistent, project-level unique BoQ code assigned to a cost item. IFC model ↔ BoQ spreadsheet (e.g., Excel) ↔ external tools This does not replace existing cost structures in IFC. ⸻ Why IFCUniqueBoQ? In many EU workflows, each BoQ row has a unique contractual code. Currently, this linkage is not formally standardized. IFCUniqueBoQ would: ⸻ Measurement Logic Must Be Explicit The same geometric object may be measured differently depending on contractual rules. Therefore, IFCUniqueBoQ must explicitly declare its measurement basis. Example: Concrete block wall Variant 1 – measured by wall area Variant 2 – measured by block count The wall geometry remains the same (e.g., IfcWall). This ensures deterministic quantity calculation. ⸻ Layered Wall Example Consider a wall composed of: In practical EU BoQ workflows, these are separate BoQ items. Example: Blocks Plaster Paint Insulation Each cost item references the same wall object but calculates quantity according to its declared measurement rule. ⸻ Important Clarification This proposal does not introduce new measurement types. The proposal introduces: This would improve: The proposal is intended as an optional extension and does not interfere with existing IFC workflows. |
|
One more example : Let me explain the proposal using a complete practical example, starting from spatial structure. The goal is to clarify the difference between: • Object identity and why a standardized BoQ identifier is useful. ⸻ Example: Ventilation System in a Building
In IFC, we typically have: Building Inside Room 203 we place: IfcUnitaryEquipment (Ventilator) Each ventilator has: • GlobalId (technical unique identifier) Example objects: Room 203 Room 204 Each of these is a separate IFC object. ⸻
All three fans may reference the same type: Fan type: 2.5 kW supply fan This defines technical properties such as: • Power But this still does not define contractual cost aggregation. ⸻
In the Bill of Quantities (Excel), the contractor usually sees: BoQ Code: VENT-01 This is a single contractual row. So we have: 3 IFC objects This is a one-to-many relationship. ⸻ Why GlobalId Is Not Enough Each ventilator already has a GlobalId. • GlobalId identifies the object technically If one fan is deleted or added, the BoQ quantity changes — but the BoQ row must remain stable. That is why a persistent BoQ-level identifier is useful. ⸻ Proposed Concept Each cost item would carry a standardized BoQ identifier (working concept: IFCUniqueBoQ). Example: Cost Item All relevant ventilator objects reference this cost item. This enables: • Deterministic aggregation ⸻ Extension Example: Location-Based BoQ If the contract requires separation per room, the BoQ structure may be: VENT-01-R203 In this case, cost grouping is defined at project level, not derived automatically from spatial structure. This again shows why contractual identity must be explicitly declared rather than inferred. ⸻ Conclusion IFC already provides: • Object identity (GlobalId) What is missing is a standardized, persistent contractual identifier at cost item level that ensures reliable linking between: IFC model ↔ BoQ spreadsheet ↔ external tools The proposal does not replace existing cost entities, but formalizes contractual grouping logic. |
|
Maybe just to add this unique BoQ Code for all equal cost elements in future IFC 4.4 to have complete old ifc standard then in IFC 5 go to modern technology |
Uh oh!
There was an error while loading. Please reload this page.
Summary
This proposal introduces a unified Construction Logic Package for IFC5 that integrates:
• Standardized Bill of Quantities (BoQ) generation
• Persistent cost-to-model linking
• Rule-based cost dependencies
• Model completeness validation
• Structured spreadsheet interoperability
The objective is to evolve IFC from a geometry-centric exchange format into a construction-aware model capable of supporting procurement, cost control, validation, and execution workflows across EU markets.
⸻
Across the EU, construction workflows rely on:
• Spreadsheet-based Bills of Quantities (BoQ)
• National or project-specific cost classifications
• Manual quantity take-offs
• External validation processes
Current IFC limitations:
• No standardized BoQ structure for procurement use
• No persistent link between model elements and BoQ rows
• No conditional cost generation
• No enforcement of construction dependencies
• No standardized validation mechanism for missing required elements
As a result:
• Quantity mismatches occur
• Cost items are missing
• Construction supports or secondary systems are omitted
• Tendering and execution risks increase
IFC currently models objects — but does not model construction logic.
⸻
The IFC5 Construction Logic Package introduces three integrated layers:
1. Structured BoQ Integration Layer
2. Rule-Based Dependency Layer
3. Model Completeness and Validation Layer
These layers are optional and backward-compatible.
⸻
3.1 Persistent BoQ Identifier
Each cost-related entity should include:
• Unique BoQ code
• Persistent identifier
• Classification reference
• Linked IFC object references
• Declared quantity derivation method
This ensures:
• One-to-many linking (multiple objects → single BoQ row)
• Traceability from cost to geometry
• Stability across revisions
⸻
3.2 Standardized Quantity Derivation
IFC5 should formalize quantity derivation types:
• Length-based (pipes, ducts, cables)
• Area-based (insulation, finishes)
• Volume-based (concrete, excavation)
• Count-based (equipment)
Each BoQ item must define:
• Measurement rule
• Unit
• Aggregation logic
• Source geometry or property
This enables automatic BoQ generation.
⸻
3.3 Spreadsheet Interoperability
IFC5 should define a standardized export view compatible with EU spreadsheet-based BoQs.
Recommended structure:
• BoQ Code
• Description
• Unit
• Quantity
• Unit Price (optional)
• Total
• Linked IFC Object IDs
The goal is not to replace Excel, but to standardize its connection to IFC.
⸻
IFC5 should support declarative construction rules consisting of:
• Condition
• Action
• Severity
• Priority
Rules must be data-driven and interpretable by software.
⸻
4.1 Conditional Cost Expansion
Example:
If pipe installation type = Underground
→ Automatically associate earthworks cost items
If system pressure exceeds threshold
→ Add mandatory pressure testing task
This ensures parametric cost consistency.
⸻
4.2 Mandatory Object Dependencies
Example:
If HVAC equipment is ceiling-mounted
AND no support structure exists
→ Raise validation error
If insulation-required system exists
AND insulation object is missing
→ Raise warning or error
This enforces construction completeness.
⸻
IFC5 should allow structured validation rules capable of:
• Detecting missing required construction elements
• Detecting orphan cost items
• Detecting objects without BoQ linkage
• Detecting quantity inconsistencies
Severity levels should include:
• Informational
• Warning
• Error
Validation results may be stored or externally reported.
⸻
Example: HVAC Model Delivery
Model contains:
• Duct systems
• Equipment
• Cost items
Construction Logic Package enables:
1. Automatic aggregation of duct lengths
2. Automatic insulation area calculation
3. Automatic BoQ row generation
4. Persistent ID linking to spreadsheet
5. Validation of required supports
6. Error notification if supports missing
Result:
• Reliable tender-ready model
• Reduced manual correction
• Increased trust in BIM-based procurement
⸻
For Engineers
• Reduced manual BoQ preparation
• Automatic dependency control
• Higher model reliability
For Contractors
• Lower tender risk
• Transparent quantity-to-geometry mapping
• Reduced change orders
For Public Authorities
• Auditability
• Procurement transparency
• Improved digital maturity
For Software Vendors
• Standardized logic framework
• Reduced proprietary rule implementations
• Increased interoperability
⸻
This proposal transforms IFC from:
Geometry + Properties
into:
Geometry + Quantity + Cost + Construction Logic
It enables IFC5 to support:
• Digital procurement
• Cost simulation
• Automated validation
• Construction readiness verification
• Model-based contractual documentation
⸻
• Fully optional
• No breaking schema changes required
• IFC4.3 files remain valid
• Construction Logic activates only when implemented
⸻
The IFC5 Construction Logic Package:
• Bridges the gap between BIM and EU procurement workflows
• Integrates BoQ and model data
• Formalizes cost dependencies
• Enables construction completeness validation
• Strengthens IFC’s role in digital construction ecosystems
This proposal aims to position IFC5 not only as a data exchange standard, but as a structured construction intelligence framework.