Read this when you need to cite a rule, doubt one, or extend the skill. Compiled September 2026 by five research passes that had to fetch each source.
Status: V = a page stating the claim was fetched. V* = also re-checked by the skill's author. U = citation resolved but content not seen, or from memory. Never quote a U number.
These are the most useful rows. Each was found by reading the source, not the summary.
| Lore | What the source says | Status |
|---|---|---|
| "Distant analogies drive discovery" (Dunbar) | 99 analogies in 16 lab meetings: 40 within-organism, 57 other-organism, 2 non-biological; distant ones "are rare and generally used for explanations". Dunbar, "How scientists think", in Ward, Smith & Vaid (Eds.), APA. | V* |
| "LLMs out-ideate experts" | Si, Yang & Hashimoto 2024 (arXiv:2409.04109): LLM ideas rated more novel as text. Si, Hashimoto & Yang 2025 (arXiv:2506.20803): 43 experts, 100+ h each, built the ideas; LLM-idea scores fell significantly more on every metric, rankings flipped on many. | V* |
| "Three quarters of innovations are need-pull" | Self-reports on successes only, no failure control (quoted in Kline & Rosenberg 1986). Mowery & Rosenberg 1979, Research Policy 8:102, attacked the coding: a need nameable afterwards is not a need that caused the invention. | V / U quote |
| "Toyota's set-based design cuts development time X%" | Ward, Liker, Cristiano & Sobek 1995, Sloan Mgmt Review: qualitative interviews, 15 suppliers; declines to compare development times; no prototype counts. | V |
| TRIZ patent levels "32/45/19/4/0.3 %" | No primary anchor reachable. | U |
| Zwicky "36,864 combinations" | Unsourced; the verifiable propulsion grid is 576. | V (576) |
| "Defer judgment" in brainstorming | Nemeth et al. 2004, Eur J Soc Psych 34:365: "the value of both types of instruction, but, in general, debate instructions were superior", in the US and France. | V* |
| "Brainstorming fails because people fear judgment" | Diehl & Stroebe 1987, JPSP 53:497: production blocking (turn-taking) explains most of the loss. | V |
| "Constraints boost creativity" | Acar, Tarakci & van Knippenberg 2019, J Management 45:96: the literature "is fragmented and yields conflicting findings". | V |
| "Prospective hindsight finds 30% more reasons" | Mitchell, Russo & Pennington 1989: citation resolves, number not seen. Use the premortem; do not quote the figure. | U |
| Taguchi's S/N ratios | Statisticians kept the engineering idea (insensitive beats precise) and rejected much of the statistics (Box 1988, Technometrics 30:1). | V citation |
| "Wrights tested 200 airfoils" | 100–200 screened, ~30–50 measured in detail; their balances read lift/drag as ratios to a reference, so absolute calibration did not matter. They corrected the inherited Smeaton coefficient 0.005 → ≈0.0033. NASA GRC, Smithsonian NASM. | V |
Ground
- Figure of merit before candidates — Ashby performance indices (E/ρ tie, E^½/ρ beam, E^⅓/ρ plate). V
- A requirement has a named owner; question it once, then freeze it — Musk interview, Everyday Astronaut 2021 ("make the requirements less dumb"; "come from a name, not a department"); Akin's Laws 13–14 ("'Better' is the enemy of 'good'"). V
- The last 10% of performance — Augustine Law XV: "generates one-third of the cost and two-thirds of the problems". V
- Experts scope longer — Atman et al. 2007, J Eng Educ 96:359: 19 practitioners vs 50 students; more time on problem scoping and information gathering. V
- Problem and solution co-evolve — Dorst & Cross 2001, Design Studies 22:425. U content. Hence: edit the need, but log the edit.
- Targets drift down silently — Simon, Sciences of the Artificial: aspiration levels adjust until something satisfices. V
- Work the limiting line — Goldratt, The Goal (identify, exploit, subordinate, elevate, repeat); Hughes 1986, "reverse salient" (may be organizational). V
- Start the analysis without all the data — Akin's Laws 9–10 ("When in doubt, estimate. In an emergency, guess. But be sure to go back and clean up the mess"). V
- Re-derive the inherited coefficient — the Wrights and Smeaton, above. V
Generate
- Whole set before critique — Dow et al. 2010, ACM TOCHI 17(4):18: parallel prototypes beat serial on click-through and expert ratings, and were more diverse. V*
- Count mechanisms, not ideas — Si 2024: ~200 non-duplicates in 4,000 LLM ideas; Meincke, Mollick & Terwiesch 2024 (arXiv:2402.01727): LLM pools less diverse than human pools, structured prompting helps; TRIZ trial (Vargas Hernandez et al., ASEE 2012): novelty and variety up, quantity down; Shah et al. 2003 metrics (U content). V
- Import an idea you did not generate — von Hippel 1976, Research Policy 5:212: ~80% of high-utility scientific-instrument innovations were invented and first field-tested by users (one industry). Doshi & Hauser 2024, Science Advances 10(28): AI-assisted outputs converge on each other. V / V citation
- Fixation is invisible to the fixated — Linsey et al. 2010, J Mech Design 132(4), doi:10.1115/1.4001110: design faculty fixate on a given example, "only partially perceive its effects", and defixation materials help. V*
- Subtract — Adams et al. 2021, Nature 592:258 (people under-search subtraction) V*; Boothroyd–Dewhurst three questions → theoretical minimum part count (dfma.com; vendor source) V; TRIZ ideal final result. Counterweight: Chesterton's fence (U); Musk: "if parts are not being added back … at least 10% of the time, not enough parts are being deleted". V
- Insensitive beats precise — Taguchi, see lore table.
- Shannon's moves — Bell Labs talk, 20 Mar 1952: simplify, find a similar solved problem, restate, generalize, break the jump into small jumps, invert. He frames them as ways to close a derivation gap. V
- Decompose and recombine — Zwicky; Pahl & Beitz (U); Ulrich & Eppinger "explore systematically" (V course pages); Arthur, The Nature of Technology: technologies are combinations of existing technologies that capture phenomena. V
- Function ladder — Miles's value analysis (GE, 1947): what does it do, what does it cost, what else would do the job, what would that cost. V secondary. FAST how–why (Bytheway): U.
- Analogical distance is split — Chan et al. 2011, J Mech Design 133:081004: far and less-common examples raise novelty and quality variability. Chan, Dow & Schunn 2015, Design Studies 36:31: citing any source helps, and closer sources help more, across a dozen challenges. V* Fu et al. 2013, J Mech Design 135:021007: too distant "may actually harm". Christensen & Schunn 2007, Memory & Cognition: in engineering practice within- and between-domain analogies are about equal; a prototype on the table suppresses between-domain ones. V
- One source from outside the team — Katz & Allen 1982, R&D Management 12:7 (NIH; group performance declines with tenure via less outside contact). U content.
- "Nobody has done this" — Ogburn & Thomas 1922, Political Science Quarterly 37:83 (multiple independent invention; count U); Akin's Law 19: "The odds are greatly against you being immensely smarter than everyone else in the field." V
Gate
- The card descends from Slocum's FRDPARRC sheet (functional requirement, design parameter, analysis, references, risks, countermeasures): "If you can't say in words what you are trying to analyze … you probably will not succeed with equations"; no risky parameter on the critical path without a countermeasure. V
- Numbers or opinion — Akin's Law 1: "Engineering is done with numbers. Analysis without numbers is only an opinion." V
- No invented scales — Olewnik & Lewis, ASME DETC2003/DTM-48669: House-of-Quality 1/3/9 scales are "no better than using a random number generator"; axiomatic design imposes a preference structure. V
- Re-rate the incumbent in your environment — NASA SE Handbook Rev 2: heritage maturity is routinely overestimated; a changed environment drops it to about TRL 5. Mankins 1995. V
- Reference class for cost and time — Flyvbjerg 2002/2006: 258 transport projects, costs exceeded estimates in 86%; "the problem is bias and not inaccuracy". Critique: Love & Ahiaga-Dagbui 2018 on sampling and baseline. V
- Set the kill result before the test — Akin's Law 25: after a test failure "it's always possible to refine the analysis to show that you really had negative margins all along". V
- Reject with physics, not unfamiliarity — Mueller, Melwani & Goncalo 2012, Psych Science 23:13: uncertainty triggers a bias against creative ideas. Rietzschel, Nijstad & Stroebe 2010, Br J Psychol 101:47: selectors pick feasible over original; telling them to pick original ones raised originality and lowered rated effectiveness. V
- "Creative" ratings track novelty, not usefulness — Kudrowitz & Wallace 2013, J Eng Design 24:120 (r² 0.80 vs 0.16). V
Rank and commit
- Test what could flip the ranking — NASA SE Handbook: uncertainty matters only if reducing it could alter the ranking; avoid "a premature focus on a single design". V
- Breed hybrids against a strong datum — Pugh controlled convergence; Frey et al. 2009, Res Eng Design 20:41 (simulation, not a human trial). V
- Simpler working ancestor — Gall 1975: "A complex system that works is invariably found to have evolved from a simple system that worked." V
Attack
- Same-session self-review is the weakest — Song 2026 (arXiv:2603.12123, single-author preprint): error-detection F1 28.6% fresh context vs 24.6% same session; repeating the self-review did not help. Both miss most injected errors. V*
- Self-correction without outside feedback can degrade — Huang et al., ICLR 2024 (arXiv:2310.01798). V listing
- LLM judges agree with humans less than humans agree with each other — Si 2024: 50–53% vs 56%. V
- Strip the user's preference from the review prompt — Cheng et al. 2025, ELEPHANT (arXiv:2505.13995): models preserve the user's face far more than humans do. V
Software and systems canon
- Put the function where complete knowledge of success lives — Saltzer, Reed & Clark, "End-to-end arguments in system design": the function "can completely and correctly be implemented only with the knowledge and help of the application standing at the endpoints"; a lower-level partial version is allowed "as a performance enhancement". Lore reads it as "never in the network". V
- Measure before optimising — Knuth 1974, Computing Surveys 6(4):268: the "premature optimization" sentence continues "Yet we should not pass up our opportunities in that critical 3%", but only after measurement, because programmers' "intuitive guesses fail". A measurement rule, not an anti-optimisation rule. V secondary
- The untouchable fraction caps the gain — Amdahl 1967. He gave no formula; the usual equation is a later codification. V secondary
- Removability asymmetry — Hoare, "The Emperor's Old Clothes": "A feature which is omitted can always be added later … included before it is fully understood can never be removed later"; and the two ways to build a design ("so simple that there are obviously no deficiencies …"). V
- Subtraction is cheap only before adoption — Hyrum's Law: with enough users "all observable behaviors of your system will be depended on by somebody". V
- Boring = known failure modes; about three innovation tokens — McKinley 2015, "Choose Boring Technology". V
- Replacing the incumbent — Spolsky 2000, "Things You Should Never Do": "It's harder to read code than to write it"; inventory what the old thing already handles. V
- Distrust a single 10× — Brooks, "No Silver Bullet": no single development promises "even one order-of-magnitude improvement"; the denial covers the accidental half. V
- Split along what changes — Parnas 1972, decomposition criteria. V partial
- Who builds it shapes it — Conway 1968: designs copy "the communication structures of these organizations". V
- Two structurally different candidates — Ousterhout, "design it twice". U (summaries only)
- Side effects and ballistic decisions — Dörner, The Logic of Failure: poor performers took "the absence of immediately obvious negative effects" as correctness; good ones tested hypotheses more often. V partial
- Guards add coupling — Perrow, Normal Accidents; critique by Hopkins 1999, Safety Science 32:93 (covers "only a very small category of accidents"). V partial
- "It has always worked" — Vaughan, normalization of deviance. Her thesis refutes the "managers overrode engineers" tale. V interview
- Lore: "fixing late costs 100×" — Boehm 1976/1981, not the 1988 spiral paper. Menzies et al. 2016 (arXiv:1609.04886), 171 projects: "no evidence for the delayed issue effect". Do not cite the multiplier; justify early tests by information per unit cost. V
- Lampson, "Hints and Principles for Computer System Design" (arXiv:2011.02455): hints are expected to contradict each other. V abstract. Koen says the same of all engineering heuristics. V
| Draft rule | Evidence against | Decision |
|---|---|---|
| Near analogies before distant | Chan 2011 (far → novelty); LLM pools are already too near (Si 2024); the near analogy is where inherited errors live (Wrights) | Near-first stays as search order. The far pass is mandatory, not optional. Prefer the less common source. Re-derive inherited numbers. "Distance is a dial with a price." |
| Novelty is a cost | Mueller 2012, Rietzschel 2010: selectors already punish novelty. Si 2025: text-judged novelty is overrated | Novelty leaves the ranking in both directions. It is unpriced risk; the kill test prices it. Rejections must cite arithmetic or physics. |
| Few survivors over many leads | Dow 2010, Girotra 2023 (tail of a large pool), Simon and Vincenti (blind variation) | Cut at selection, never at generation. Whole list first, merged by mechanism, kept in the deliverable. Cheap options stay alive in parallel. |
| Need-first | Mowery & Rosenberg 1979; Kline & Rosenberg (design is central); Dorst & Cross (co-evolution); Arthur (phenomena first) | Need-first is a survival filter, not a generation filter. The loss budget is written before ideas. Edits to the need are allowed and logged. A need first named after the idea scores zero. |
| Name the incumbent | Fixation (Jansson & Smith, Linsey); NASA on overrated heritage; Gabriel (incumbency by spread, not merit) | The incumbent is a bar, not a seed: named at the gate, re-rated in the user's environment, and it must be the strongest one. |
| Cheapest kill test | Song 2026 (model review misses most errors); Vaughan (a cheap test that keeps passing ratifies a deviation); Slocum (feasibility proven plus countermeasure); Akin Law 3 (always one more iteration) | The test states the reading if right and if wrong, before it runs. Passing clears the idea for the next test only. A part test does not probe coupling. Phase 5 attacks the tests too. |
| One line of arithmetic | Knuth and Amdahl (guesses fail); Olewnik & Lewis (invented scales) | Physical units only. A result carries the weakest label among its inputs. |
| Subtract first | Chesterton; Hyrum; NASA heritage; Musk's own 10% add-back | Learn why it is there, who asked and who depends on it. Add-backs are calibration, not failure. |
| Loss budget before ideas | Acar 2019 (constraint effects are mixed); Menzies 2016 (no 100× late-fix cost) | Kept, justified by the limiting-line argument (Goldratt, Hughes, Amdahl) and not by a cost multiplier. Budget in the physical response, not a summary ratio. |
- SAPPHO II factor ranking: original not fetched; only the negatives (firm size, formal planning and basic-research intensity did not discriminate) are consistent across summaries.